An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System
Article dans une revue avec comité de lecture
Date
2018Journal
IFAC-PapersOnLineRésumé
This paper develops a mixed-integer non-linear programming model for an integrated planning of part quality inspection and preventive maintenance activities. This model considers a serial multi-stage manufacturing system while its production stages are deteriorating nonlinearly. The deterioration is assumed a non-linear process and an approximation approach based on the separable programming is developed to cope with the non-linearity. The model determines the optimum times and locations for performing inspection and preventive maintenance activities while minimizing total manufacturing cost. The theoretical achievement of the presented approach is investigated through a numerical example.
Fichier(s) constituant cette publication
Cette publication figure dans le(s) laboratoire(s) suivant(s)
Documents liés
Visualiser des documents liés par titre, auteur, créateur et sujet.
-
Article dans une revue avec comité de lectureREZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; SIADAT, Ali; DANTAN, Jean-Yves (Springer Verlag, 2018)This paper presents a mixed-integer linear mathematical programming model for the integrated planning problem of the part quality inspection and preventive maintenance activities in serial multi-stage manufacturing system. ...
-
Article dans une revue avec comité de lectureREZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; SIADAT, Ali; DANTAN, Jean-Yves (Taylor & Francis, 2018)This paper proposes a robust possibilistic and multi-objective mixed-integer linear programming mathematical model to concurrently plan part quality inspection and Preventive Maintenance (PM) activities for a serial ...
-
A review on optimisation of part quality inspection planning in a multi-stage manufacturing system Article dans une revue avec comité de lectureREZAEI-MALEK, Mohammad; MOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; SIADAT, Ali; DANTAN, Jean-Yves (Taylor & Francis, 2018)In multi-stage manufacturing systems, optimisation of part quality inspection planning (PQIP) problem means to determine the optimal time, place and extent of inspection activities for assessing the significant quality ...
-
Article dans une revue avec comité de lectureDANTAN, Jean-Yves; ETIENNE, Alain; MOHAMMADI, Mehrdad; KHEZRI, Amirhossein; HOMRI, Lazhar; TAVAKKOLI-MOGHADDAM, Reza; SIADAT, Ali (Elsevier, 2022)The need for highly reliable and precise products has forced industries to study potential uncertainties during designing needed parts. The reliability and acceptance of the product rely on several factors and tolerancing ...
-
Article dans une revue avec comité de lectureMOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; SIADAT, Ali; DANTAN, Jean-Yves (Taylor & Francis, 2017)In this paper, a bi-objective mixed-integer linear programming (BOMILP) model for planning of an inspection process used to detect nonconforming products and malfunctioning processors in a multi-stage serial production ...