Tabu Search Algorithm for Single and Multi-model Line Balancing Problems
Communication avec acte
Abstract
This paper deals with the assembly line balancing issue. The considered objective is to minimize the weighted sum of products’ cycle times. The originality of this objective is that it is the generalization of the cycle time minimization used in single-model lines (SALBP) to the multi-model case (MALBP). An optimization algorithm made of a heuristic and a tabu-search method is presented and evaluated through an experimental study carried out on several and various randomly generated instances for both the single and multiproduct cases. The returned solutions are compared to optimal solutions given by a mathematical model from the literature and to a proposed lower bound inspired from the classical SALBP bound. The results show that the algorithm is high performing as the average relative gap between them is quite low for both problems.
Files in this item
Related items
Showing items related by title, author, creator and subject.
-
Article dans une revue avec comité de lectureQUENEHEN, Anthony; ABDELJAOUAD, Mohamed Amine; ROUCOULES, Lionel; GIBARU, Olivier; KLEMENT, Nathalie (Informa UK Limited, 2022-02)Collaborative robots have open new ways of designing assembly processes, thanks to their ability to share work space with operators. not only may they support the economical performance, but they can also improve the overall ...
-
Article dans une revue avec comité de lectureThe management of industrial systems is done through different levels, ranging from strategic (designing the system), to tactical (planning the activities and assigning the resources) and operational (scheduling the ...
-
Communication avec acteThe presented work is about optimization of the hospital system. An existing solution is the pooling of resources within the same territory. This may involve different forms of cooperation between several hospitals. Problems ...
-
Chapitre d'ouvrage scientifiqueIn any manufacturing systems, planning and scheduling are not intuitive. Some dedicate tools may exist to help some specific companies to daily plan and assign their activities. Our purpose is to develop a generic decision ...
-
Communication avec acteHuman Robot Collaboration is seen as a significant feature of Industry 4.0 implementation. Collaborative robots (cobots) are supposed to deliver superior process performance, which was so far achieved through the application ...