• français
    • English
    français
  • Login
Help
View Item 
  •   Home
  • Laboratoire de Conception Fabrication Commande (LCFC)
  • View Item
  • Home
  • Laboratoire de Conception Fabrication Commande (LCFC)
  • View Item
JavaScript is disabled for your browser. Some features of this site may not work without it.

A two-stage robust hub location problem with accelerated Benders decomposition algorithm

Article dans une revue avec comité de lecture
Author
RAHMATI, Reza
119054 Shahed University [Téhéran]
BASHIRI, Mahdi
302852 Coventry University
NIKZAD, Erfaneh
119054 Shahed University [Téhéran]
ccSIADAT, Ali
107452 Laboratoire de Conception Fabrication Commande [LCFC]

URI
http://hdl.handle.net/10985/22200
DOI
10.1080/00207543.2021.1953179
Date
2021-09
Journal
International Journal of Production Research

Abstract

In this paper, a two-stage robust optimisation is presented for an uncapacitated hub location problem in which demand is uncertain and the level of conservatism is controlled by an uncertainty budget. In the first stage, locations for establishing hub facilities were determined, and allocation decisions were made in the second stage. An accelerated Benders decomposition algorithm was used to solve the problem. Computational experiments showed better results in terms of number of iterations and computation time for Benders decomposition with Pareto-optimal cuts in comparison with the classical Benders decomposition algorithm. According to numerical analysis, it was concluded that increasing the uncertainty budget also increased total costs for more established hubs. To determine the uncertainty budget in an appropriate manner, a new expected aggregate function was introduced. The numerical studies demonstrated the usefulness of the proposed method in defining the appropriate uncertainty budget in the presence of uncertainty.

Files in this item

Name:
LCFC_IJPR_2021_SIADAT.pdf
Size:
2.616Mb
Format:
PDF
View/Open

Collections

  • Laboratoire de Conception Fabrication Commande (LCFC)

Related items

Showing items related by title, author, creator and subject.

  • An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms 
    Article dans une revue avec comité de lecture
    MOUSAVI, Seyed Meysam; MIRDAMADI, Shirin; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2015)
    Most of complex selection problems in real-life applications are considered under multiple conflicting attributes formanufacturing firms. The appropriate selection plays an important role in the firm's performance from the ...
  • Design of a reliable logistics network with hub disruption under uncertainty 
    Article dans une revue avec comité de lecture
    MOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2016)
    In this study, we design a reliable logistics network based on a hub location problem, which is less sensitive to disruption and it performs efficiently when disruption occurs. A new mixed-integer programming model is ...
  • A review on optimisation of part quality inspection planning in a multi-stage manufacturing system 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; MOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Taylor & Francis, 2018)
    In multi-stage manufacturing systems, optimisation of part quality inspection planning (PQIP) problem means to determine the optimal time, place and extent of inspection activities for assessing the significant quality ...
  • An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2018)
    This paper develops a mixed-integer non-linear programming model for an integrated planning of part quality inspection and preventive maintenance activities. This model considers a serial multi-stage manufacturing system ...
  • A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Taylor & Francis, 2018)
    This paper proposes a robust possibilistic and multi-objective mixed-integer linear programming mathematical model to concurrently plan part quality inspection and Preventive Maintenance (PM) activities for a serial ...

Browse

All SAMCommunities & CollectionsAuthorsIssue DateCenter / InstitutionThis CollectionAuthorsIssue DateCenter / Institution

Newsletter

Latest newsletterPrevious newsletters

Statistics

Most Popular ItemsStatistics by CountryMost Popular Authors

ÉCOLE NATIONALE SUPERIEURE D'ARTS ET METIERS

  • Contact
  • Mentions légales

ÉCOLE NATIONALE SUPERIEURE D'ARTS ET METIERS

  • Contact
  • Mentions légales