• français
    • English
    English
  • Ouvrir une session
Aide
Voir le document 
  •   Accueil de SAM
  • Laboratoire de Conception Fabrication Commande (LCFC)
  • Voir le document
  • Accueil de SAM
  • Laboratoire de Conception Fabrication Commande (LCFC)
  • Voir le document
JavaScript is disabled for your browser. Some features of this site may not work without it.

A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty

Article dans une revue avec comité de lecture
Auteur
REZAEI-MALEK, Mohammad
301046 University of Tehran
TAVAKKOLI-MOGHADDAM, Reza
301046 University of Tehran
ccSIADAT, Ali
107452 Laboratoire de Conception Fabrication Commande [LCFC]
ccDANTAN, Jean-Yves

URI
http://hdl.handle.net/10985/17755
DOI
10.1080/00207543.2018.1556411
Date
2018
Journal
International Journal of Production Research

Résumé

This paper proposes a robust possibilistic and multi-objective mixed-integer linear programming mathematical model to concurrently plan part quality inspection and Preventive Maintenance (PM) activities for a serial multi-stage production system. This system contains the deteriorating stages and faces the uncertainty about estimated cost components and demand amount. The integrated model reaches two significant decisions which are the right time and place for performing the part quality inspection and PM. These decisions are made while the model is to simultaneously optimise the implied system productivity and total cost. To measure the implied system productivity, a new piecewise utility function for the ratio of produced conforming products to input workpieces is developed. A real case study and a numerical example are explored to validate and verify the developed model. The results prove the significance and effectiveness of considering the uncertainty and conflicting practical objectives for the problem.

Fichier(s) constituant cette publication

Nom:
LCFC_IJPR_2018_SIADAT.pdf
Taille:
1.641Mo
Format:
PDF
Voir/Ouvrir

Cette publication figure dans le(s) laboratoire(s) suivant(s)

  • Laboratoire de Conception Fabrication Commande (LCFC)

Documents liés

Visualiser des documents liés par titre, auteur, créateur et sujet.

  • An Approximation Approach for an Integrated Part Quality Inspection and Preventive Maintenance Planning in a Nonlinear Deteriorating Serial Multi-stage Manufacturing System 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2018)
    This paper develops a mixed-integer non-linear programming model for an integrated planning of part quality inspection and preventive maintenance activities. This model considers a serial multi-stage manufacturing system ...
  • A novel model for the integrated planning of part quality inspection and preventive maintenance in a linear-deteriorating serial multi-stage manufacturing system 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Springer Verlag, 2018)
    This paper presents a mixed-integer linear mathematical programming model for the integrated planning problem of the part quality inspection and preventive maintenance activities in serial multi-stage manufacturing system. ...
  • A review on optimisation of part quality inspection planning in a multi-stage manufacturing system 
    Article dans une revue avec comité de lecture
    REZAEI-MALEK, Mohammad; MOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Taylor & Francis, 2018)
    In multi-stage manufacturing systems, optimisation of part quality inspection planning (PQIP) problem means to determine the optimal time, place and extent of inspection activities for assessing the significant quality ...
  • An intuitionistic fuzzy grey model for selection problems with an application to the inspection planning in manufacturing firms 
    Article dans une revue avec comité de lecture
    MOUSAVI, Seyed Meysam; MIRDAMADI, Shirin; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2015)
    Most of complex selection problems in real-life applications are considered under multiple conflicting attributes formanufacturing firms. The appropriate selection plays an important role in the firm's performance from the ...
  • Design of a reliable logistics network with hub disruption under uncertainty 
    Article dans une revue avec comité de lecture
    MOHAMMADI, Mehrdad; TAVAKKOLI-MOGHADDAM, Reza; ccSIADAT, Ali; ccDANTAN, Jean-Yves (Elsevier, 2016)
    In this study, we design a reliable logistics network based on a hub location problem, which is less sensitive to disruption and it performs efficiently when disruption occurs. A new mixed-integer programming model is ...

Parcourir

Tout SAMLaboratoiresAuteursDates de publicationCampus/InstitutsCe LaboratoireAuteursDates de publicationCampus/Instituts

Lettre Diffuser la Science

Dernière lettreVoir plus

Statistiques de consultation

Publications les plus consultéesStatistiques par paysAuteurs les plus consultés

ÉCOLE NATIONALE SUPERIEURE D'ARTS ET METIERS

  • Contact
  • Mentions légales

ÉCOLE NATIONALE SUPERIEURE D'ARTS ET METIERS

  • Contact
  • Mentions légales